ITAC Assessment: AS0584
ITAC logo
ITAC Assessment: AS0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Bill acceptors
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 59,746
ft2
Annual Production 166,535
units
Production Hrs. Annual 2,026
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,554 890,660
kWh
Electricity Demand $15,175 1,972
kW-mo/yr
Electricity Fees $5,869 -
Natural Gas $8,806 841
MMBtu
Waste Disposal Costs
Water Usage $1,676 698
Tgal
TOTAL YEARLY COSTS $130,080
RECOMMENDED SAVINGS* $115,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.2176: Increase use of automation $73,061 $428,000 $(-2,712.0)
(-24,500)
kWh
$(-1,155.0)
-
kW-mo/yr
- $81,928 $(-5,000.0) -
02 2.9114: Use solar heat to make electricty $21,817 $160,594 $20,165
182,159
kWh
$1,652
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,657 $8,115 $3,565
32,196
kWh
$1,469
-
kW-mo/yr
- - $623 -
04 2.8114: Change rate schedules or other changes in utility service $5,396 $154 - - - - - $5,396
05 2.7226: Use computer programs to optimize hvac performance $5,118 $1,273 $3,451
31,173
kWh
$1,421
-
kW-mo/yr
$246
-
MMBtu
- - -
06 2.7132: Install timers on light switches in little used areas $3,113 $759 $3,113
28,121
kWh
- - - - -
07 2.7135: Install occupancy sensors $1,782 $666 $1,262
11,399
kWh
$520
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $115,944 $599,561 $28,844
260,548
kWh
$3,907
-
kW-mo/yr
$246
-
MMBtu
$81,928 $(-4,377.0) $5,396
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs