ITAC Assessment: SD0362
ITAC logo
ITAC Assessment: SD0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Construction Nails
NAICS 332613: Spring Manufacturing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 80,000
ft2
Annual Production 48,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,778 2,920,779
kWh
Electricity Demand $98,608 7,148
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $286,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4238: Do not use compressed air for personal cooling $41,074 $6,300 $30,711
375,447
kWh
$10,363
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $16,917 - $16,917
206,812
kWh
- -
03 2.7135: Install occupancy sensors $14,251 $3,500 $14,251
174,221
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,614 $26,000 $7,978
97,528
kWh
$2,636
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $749 $80 $560
6,848
kWh
$189
-
kW-mo/yr
-
06 3.5212: Regrind, reuse, or sell scrap plastic parts $194,956 $92,000 $(-1,220.0)
(-14,920)
kWh
$(-6,177.0)
-
kW-mo/yr
$202,353
-
lb
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,160 $18,500 - - $8,160
-
lb
TOTAL RECOMMENDED $286,721 $146,380 $69,197
845,936
kWh
$7,011
-
kW-mo/yr
$210,513
-
lb
TOTAL IMPLEMENTED $83,605 $35,880 $70,417
860,856
kWh
$13,188
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs