| Assessment Year | 1989 |
|---|---|
| Principal Product | PICKLES,RELISH & MUSTARD |
| NAICS |
n/a
|
| SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 31,500,000
lb
|
| Production Hrs. Annual | 3,200
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,512 | 1,315,064 |
kWh
|
$0.052 |
| Natural Gas | $51,477 | 19,535 |
MMBtu
|
$2.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,213 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,232 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $519 | $500 |
$519
9,965
kWh
|
- | - | |
| 02 | 3.4115: Recover and reuse cooling water | $622 | $316 | - |
$399
-
MMBtu
|
$223 | |
| 03 | 3.4115: Recover and reuse cooling water | $473 | $402 | - |
$304
-
MMBtu
|
$169 | |
| 04 | 2.4133: Use most efficient type of electric motors | $135 | $138 |
$135
2,638
kWh
|
- | - | |
| 05 | 2.2441: Preheat boiler makeup water with waste process heat | $1,545 | $7,500 | - |
$1,545
-
MMBtu
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $10,327 | $13,600 |
$10,327
198,710
kWh
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $592 | $1,500 |
$592
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $14,213 | $23,956 |
$11,573
211,313
kWh
|
$2,248
-
MMBtu
|
$392 | ||
| TOTAL IMPLEMENTED | $3,232 | $9,718 |
$592
-
kWh
|
$2,248
-
MMBtu
|
$392 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs