ITAC Assessment: GT0987
ITAC logo
ITAC Assessment: GT0987
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Diesel Engines
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 68,000
ft2
Annual Production 20,695
units
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,631 1,403,703
kWh
Natural Gas $23,582 2,892
MMBtu
TOTAL YEARLY COSTS $224,213
RECOMMENDED SAVINGS* $109,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,398 $1,850 $32,298
230,703
kWh
$(-2,900.0)
02 2.4239: Eliminate or reduce compressed air usage $1,518 $100 $1,518
10,839
kWh
-
03 2.6218: Turn off equipment when not in use $7,859 $1,800 $7,859
56,138
kWh
-
04 2.6211: Conserve energy by efficient use of vending machines $369 $90 $369
2,632
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,073 $800 $2,073
14,806
kWh
-
06 2.6218: Turn off equipment when not in use $827 $1,740 $827
5,909
kWh
-
07 2.7135: Install occupancy sensors $339 $875 $339
2,421
kWh
-
08 2.9114: Use solar heat to make electricty $67,106 $614,572 $67,106
479,932
kWh
-
TOTAL RECOMMENDED $109,489 $621,827 $112,389
803,380
kWh
$(-2,900.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs