ITAC Assessment: SF0575
ITAC logo
ITAC Assessment: SF0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product HDPE pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 30,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,316 4,964,436
kWh
Electricity Demand $95,054 10,546
kW-mo/yr
Electricity Fees $18,928 -
Natural Gas $6,460 1,395
MMBtu
Waste Disposal Costs
Water Usage $3,748 861
Tgal
TOTAL YEARLY COSTS $452,506
RECOMMENDED SAVINGS* $74,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,492 $100 $1,254
18,964
kWh
$238
-
kW-mo/yr
- -
02 2.2625: Chill water to the highest temperature possible $5,510 - $4,602
69,622
kWh
$908
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $6,526 - $5,246
79,366
kWh
$1,280
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,084 - $2,084
31,536
kWh
- - -
05 2.6218: Turn off equipment when not in use $6,642 $1,513 $6,642
100,485
kWh
- - -
06 2.7224: Reduce space conditioning during non-working hours $3,311 $966 $3,311
50,091
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,748 $1,047 $1,473
22,251
kWh
$275
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,559 $16,052 $16,488
249,437
kWh
$3,071
-
kW-mo/yr
- -
09 2.6231: Utilize controls to operate equipment only when needed $1,137 $1,513 $1,137
17,195
kWh
- - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $12,624 $18,284 $12,624
190,990
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $11,353 $19,986 $8,992
136,042
kWh
$2,262
-
kW-mo/yr
$918 $(-819.0)
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,554 $6,764 $2,554
38,365
kWh
- - -
TOTAL RECOMMENDED $74,540 $66,225 $66,407
1,004,344
kWh
$8,034
-
kW-mo/yr
$918 $(-819.0)
TOTAL IMPLEMENTED $61,012 $66,125 $55,305
836,392
kWh
$5,608
-
kW-mo/yr
$918 $(-819.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings