Assessment Year | 2021 |
---|---|
Principal Product | HDPE pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $5 M to 10M |
# of Employees | 90 |
Plant Area |
30,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $328,316 | 4,964,436 |
kWh
|
$0.066 | |
Electricity Demand | $95,054 | 10,546 |
kW-mo/yr
|
$9.01 | |
Electricity Fees | $18,928 | - |
|
- | |
Natural Gas | $6,460 | 1,395 |
MMBtu
|
$4.63 | |
Waste Disposal Costs | |||||
Water Usage | $3,748 | 861 |
Tgal
|
$4.35 | |
TOTAL YEARLY COSTS | $452,506 | ||||
RECOMMENDED SAVINGS* | $74,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $61,012 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,492 | $100 |
$1,254
18,964
kWh
|
$238
-
kW-mo/yr
|
- | - | |
02 | 2.2625: Chill water to the highest temperature possible | $5,510 | - |
$4,602
69,622
kWh
|
$908
-
kW-mo/yr
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $6,526 | - |
$5,246
79,366
kWh
|
$1,280
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,084 | - |
$2,084
31,536
kWh
|
- | - | - | |
05 | 2.6218: Turn off equipment when not in use | $6,642 | $1,513 |
$6,642
100,485
kWh
|
- | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $3,311 | $966 |
$3,311
50,091
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,748 | $1,047 |
$1,473
22,251
kWh
|
$275
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,559 | $16,052 |
$16,488
249,437
kWh
|
$3,071
-
kW-mo/yr
|
- | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $1,137 | $1,513 |
$1,137
17,195
kWh
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,624 | $18,284 |
$12,624
190,990
kWh
|
- | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,353 | $19,986 |
$8,992
136,042
kWh
|
$2,262
-
kW-mo/yr
|
$918 | $(-819.0) | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,554 | $6,764 |
$2,554
38,365
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $74,540 | $66,225 |
$66,407
1,004,344
kWh
|
$8,034
-
kW-mo/yr
|
$918 | $(-819.0) | ||
TOTAL IMPLEMENTED | $61,012 | $66,125 |
$55,305
836,392
kWh
|
$5,608
-
kW-mo/yr
|
$918 | $(-819.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs