Assessment Year | 2022 |
---|---|
Principal Product | Copper |
NAICS | 212234: Copper Ore and Nickel Ore Mining |
SIC | 1021: Copper Ores |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
236,790
ft2
|
Annual Production | 53,700
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $7,370,860 | 293,659,778 |
kWh
|
$0.025 |
Electricity Demand | $9,245,579 | 444,712 |
kW-mo/yr
|
$20.79 |
TOTAL YEARLY COSTS | $16,616,439 | |||
RECOMMENDED SAVINGS* | $649,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $648,533 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $269,225 | $7,636,800 |
$251,907
10,036,140
kWh
|
$17,318
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $371,933 | $40,000 | - |
$371,933
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,764 | $4,720 |
$1,292
51,522
kWh
|
$1,472
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,736 | $1,307 |
$1,282
51,070
kWh
|
$1,454
-
kW-mo/yr
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,875 | $5,000 |
$879
35,000
kWh
|
$996
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $946 | $3,500 |
$946
38,410
kWh
|
- | |
TOTAL RECOMMENDED | $649,479 | $7,691,327 |
$256,306
10,212,142
kWh
|
$393,173
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $648,533 | $7,687,827 |
$255,360
10,173,732
kWh
|
$393,173
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs