2,455
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT1002 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $115,363 | $829,891 | |
| GT1002 #05 Y:2025 | 05 | 2025 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $366,345 | $1,207,500 | |
| GT1002 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,772 | $20,582 | |
| GT1002 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $3,807 | $4,806 | |
| GT1002 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $1,240 | $930 | |
| WV0614 #02 Y:2021 | 02 | 2021 | Upgrade controls on compressors | $37,679 | $34,222 | |
| WV0614 #01 Y:2021 | 01 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $399,970 | $573,165 | |
| CL2105 #11 Y:2021 | 11 | 2021 | Use flow control valves on equipment to optimize water use | $982 | $3,050 | |
| CL2105 #09 Y:2021 | 09 | 2021 | Install waste heat boiler to provide direct power | $24,497 | $17,450 | |
| CL2105 #08 Y:2021 | 08 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $25,046 | $7,102 | |
| CL2105 #07 Y:2021 | 07 | 2021 | Use optimum temperature | $81,375 | - | |
| CL2105 #05 Y:2021 | 05 | 2021 | Use solar heat to make electricty | $567,975 | $4,358,847 | |
| CL2105 #03 Y:2021 | 03 | 2021 | Reschedule plant operations or reduce load to avoid peaks | $34,939 | $1,120 | |
| CL2102 #02 Y:2021 | 02 | 2021 | Install occupancy sensors | $322 | $453 | |
| NC0657 #05 Y:2020 | 05 | 2020 | Use / purchase optimum sized compressor | $6,980 | $30,000 | |
| NC0657 #03 Y:2020 | 03 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $592 | $400 | |
| NC0657 #01 Y:2020 | 01 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $1,055 | $3,404 | |
| NC0655 #03 Y:2020 | 03 | 2020 | Change rate schedules or other changes in utility service | $12,039 | $500 | |
| NC0655 #02 Y:2020 | 02 | 2020 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $49,654 | $612,000 | |
| NC0655 #01 Y:2020 | 01 | 2020 | Replace electrically-operated equipment with fossil fuel equipment | $92,988 | $168,000 |