ITAC Assessment: NC0657
ITAC logo
ITAC Assessment: NC0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Office furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 264,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,782 2,970,504
kWh
Electricity Demand $70,418 13,695
kW-mo/yr
Electricity Fees $9,019 -
Natural Gas $95,930 12,476
MMBtu
Waste Disposal Costs
Water Usage $10,000 1,000
Tgal
TOTAL YEARLY COSTS $443,149
RECOMMENDED SAVINGS* $9,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,055 $3,404 $761
8,767
kWh
$294
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $194 $493 $194
2,235
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $592 $400 $428
4,932
kWh
$164
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,082 $5,265 $780
8,991
kWh
$302
-
kW-mo/yr
05 2.4226: Use / purchase optimum sized compressor $6,980 $30,000 $5,034
58,000
kWh
$1,946
-
kW-mo/yr
TOTAL RECOMMENDED $9,903 $39,562 $7,197
82,925
kWh
$2,706
-
kW-mo/yr
TOTAL IMPLEMENTED $1,276 $5,758 $974
11,226
kWh
$302
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs