ITAC Assessment: NC0652
ITAC logo
ITAC Assessment: NC0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product HVAC Equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area 280,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,016 1,663,840
kWh
Electricity Demand $89,835 8,330
kW-mo/yr
Electricity Fees $1,367 -
Natural Gas $79,995 11,759
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $277,214
RECOMMENDED SAVINGS* $61,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $1,160 $100 $1,160
18,202
kWh
- - -
02 2.7135: Install occupancy sensors $631 $700 $631
9,900
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $465 $390 $231
3,623
kWh
$234
-
kW-mo/yr
- -
04 2.8114: Change rate schedules or other changes in utility service $11,865 $500 $11,865
-
kWh
- - -
05 2.8114: Change rate schedules or other changes in utility service $40,922 $1,000 $(-49,944.0)
-
kWh
$89,835
-
kW-mo/yr
$1,031 -
06 4.512: Condense operation into one building $6,086 $4,800 $1,159
18,200
kWh
$1,177
-
kW-mo/yr
- $3,750
TOTAL RECOMMENDED $61,129 $7,490 $(-34,898.0)
49,925
kWh
$91,246
-
kW-mo/yr
$1,031 $3,750
TOTAL IMPLEMENTED $12,961 $1,590 $12,727
13,523
kWh
$234
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs