ITAC Assessment: NC0655
ITAC logo
ITAC Assessment: NC0655
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wheel hubs for trucks
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 300,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,241 4,257,160
kWh
Electricity Demand $161,653 15,571
kW-mo/yr
Electricity Fees $6,000 -
Natural Gas $49,545 4,650
MMBtu
Waste Disposal Costs
Water Usage $20,005 6,876
Tgal
TOTAL YEARLY COSTS $533,444
RECOMMENDED SAVINGS* $154,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $92,988 $168,000 $117,763
1,692,000
kWh
$52,103
-
kW-mo/yr
$(-76,878.0)
-
MMBtu
02 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $49,654 $612,000 $49,444
710,400
kWh
$29,520
-
kW-mo/yr
$(-29,310.0)
-
MMBtu
03 2.8114: Change rate schedules or other changes in utility service $12,039 $500 $77,518
1
kWh
$(-65,479.0)
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $310 $500 $310
4,460
kWh
- -
TOTAL RECOMMENDED $154,991 $781,000 $245,035
2,406,861
kWh
$16,144
-
kW-mo/yr
$(-106,188.0)
-
MMBtu
TOTAL IMPLEMENTED $310 $500 $310
4,460
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs