| Assessment Year | 2021 |
|---|---|
| Principal Product | Wheel hubs for trucks |
| NAICS | 336120: Heavy Duty Truck Manufacturing |
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | $100 M to 500M |
| # of Employees | 140 |
| Plant Area |
300,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $296,241 | 4,257,160 |
kWh
|
$0.070 | |
| Electricity Demand | $161,653 | 15,571 |
kW-mo/yr
|
$10.38 | |
| Electricity Fees | $6,000 | - |
|
- | |
| Natural Gas | $49,545 | 4,650 |
MMBtu
|
$10.65 | |
| Waste Disposal Costs | |||||
| Water Usage | $20,005 | 6,876 |
Tgal
|
$2.91 | |
| TOTAL YEARLY COSTS | $533,444 | ||||
| RECOMMENDED SAVINGS* | $154,991 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $310 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $92,988 | $168,000 |
$117,763
1,692,000
kWh
|
$52,103
-
kW-mo/yr
|
$(-76,878.0)
-
MMBtu
|
|
| 02 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $49,654 | $612,000 |
$49,444
710,400
kWh
|
$29,520
-
kW-mo/yr
|
$(-29,310.0)
-
MMBtu
|
|
| 03 | 2.8114: Change rate schedules or other changes in utility service | $12,039 | $500 |
$77,518
1
kWh
|
$(-65,479.0)
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $310 | $500 |
$310
4,460
kWh
|
- | - | |
| TOTAL RECOMMENDED | $154,991 | $781,000 |
$245,035
2,406,861
kWh
|
$16,144
-
kW-mo/yr
|
$(-106,188.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $310 | $500 |
$310
4,460
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs