Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

835

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0095 #06 Y:2024 Eliminate or reduce compressed air usage $647 $2,000
NL0095 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $652 $373
NL0095 #03 Y:2024 Apply for tax-free status for energy purchases $11,145 $2,000
NL0095 #02 Y:2024 Recharge batteries on during off-peak demand periods $14,437 $500
NL0095 #01 Y:2024 Improve air circulation with destratification fans / other methods $65,447 $72,000
WM0223 #06 Y:2024 Use photocell controls $406 $200
WM0223 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $946 -
WM0223 #04 Y:2024 Lower temperature during the winter season and vice-versa $971 -
WM0223 #03 Y:2024 Install compressor air intakes in coolest locations $1,062 $994
WM0223 #02 Y:2024 Eliminate or reduce compressed air usage $1,472 $5,580
WM0223 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,737 $8,466
WM0222 #04 Y:2024 Reduce space conditioning during non-working hours $1,041 -
WM0222 #03 Y:2024 Install compressor air intakes in coolest locations $2,034 $4,262
WM0222 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,848 $12,763
WM0222 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $13,099 $21,586
NL0087 #08 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,019 $768
NL0087 #06 Y:2023 Recover and reuse waste material $10,817 $3,660
NL0087 #05 Y:2023 Use heat from boiler blowdown to preheat boiler feed water $11,616 $7,640
NL0087 #04 Y:2023 Use excess cold process fluid for industrial cooling needs $12,625 $8,000
NL0087 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $491,419 $1,990,800