| Assessment Year | 2025 |
|---|---|
| Principal Product | Aluminum castings |
| NAICS | 331524: Aluminum Foundries (except Die-Casting) |
| SIC | 3365: Aluminum Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
91,728
ft2
|
| Annual Production | 4,896,947
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $97,399 | 3,489,344 |
kWh
|
$0.028 | |
| Electricity Demand | $121,281 | 10,134 |
kW-mo/yr
|
$11.97 | |
| Electricity Fees | $206,838 | - |
|
- | |
| Natural Gas | $206,291 | 44,325 |
MMBtu
|
$4.65 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,176 | 724 |
Tgal
|
$7.15 | |
| TOTAL YEARLY COSTS | $636,985 | ||||
| RECOMMENDED SAVINGS* | $111,353 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $108,557 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $97,017 | $800,000 | - | - |
$97,017
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,262 | $1,500 |
$6,472
231,159
kWh
|
$3,790
-
kW-mo/yr
|
- | |
| 03 | 2.1221: Replace obsolete burners with more efficient ones | $2,094 | $18,160 | - | - |
$2,094
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,278 | - |
$572
20,424
kWh
|
$706
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $373 | $3,136 |
$153
5,467
kWh
|
$220
-
kW-mo/yr
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $329 | $810 |
$201
7,179
kWh
|
$128
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $111,353 | $823,606 |
$7,398
264,229
kWh
|
$4,844
-
kW-mo/yr
|
$99,111
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $108,557 | $801,500 |
$7,044
251,583
kWh
|
$4,496
-
kW-mo/yr
|
$97,017
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs