ITAC Assessment: OD0045
ITAC logo
ITAC Assessment: OD0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Treated Lumber
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 15,000
ft2
Annual Production 50,000
thousand feet
Production Hrs. Annual 5,321
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,758 801,583
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4323: Use optimum size and capacity equipment $2,747 $704 $2,747
21,688
kWh
02 2.7135: Install occupancy sensors $1,115 $394 $1,115
9,379
kWh
03 2.7261: Install timers and/or thermostats $4,702 - $4,702
97,890
kWh
04 2.4133: Use most efficient type of electric motors $3,130 $13,131 $3,130
40,739
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $96 $57 $96
879
kWh
06 2.3134: Shift from daytime to nighttime operation $2,641 - $2,641
-
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $160 $480
4,103
kWh
TOTAL RECOMMENDED $14,911 $14,446 $14,911
174,678
kWh
TOTAL IMPLEMENTED $9,523 $13,742 $9,523
152,990
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs