Assessment Year | 1996 |
---|---|
Principal Product | bumpers |
NAICS |
n/a
|
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
170,000
ft2
|
Annual Production | 8,512,466
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,085 | 5,514,361 |
kWh
|
$0.023 |
Electricity Demand | $111,874 | 11,868 |
kW-mo/yr
|
$9.43 |
Electricity Fees | $4,090 | - |
|
- |
Natural Gas | $129,546 | 49,407 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,562 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,986 | $8,775 |
$16,200
539,859
kWh
|
$12,222
-
kW-mo/yr
|
$(-6,436.0)
-
MMBtu
|
- | - | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $7,411 | $4,200 | - | - | - | - | - | $7,411 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,992 | $506 |
$6,189
206,331
kWh
|
$2,803
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,499 | $50 |
$1,035
34,584
kWh
|
$464
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $3,216 | - |
$2,214
73,857
kWh
|
$1,002
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,383 | $1,792 |
$949
31,653
kWh
|
$434
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,798 | $3,215 |
$1,236
41,325
kWh
|
$562
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7135: Install occupancy sensors | $1,049 | $1,597 |
$585
19,637
kWh
|
$464
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $159 | $338 |
$118
3,810
kWh
|
$41
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $643 | - |
$643
21,395
kWh
|
- | - | - | - | - | |
11 | 3.1161: Eliminate/reduce an operation | $30,120 | $3,800 | - | - | - |
$30,120
-
gal
|
- | - | |
12 | 3.7198: Reduce / eliminate use of disposable product | $5,328 | $1,370 | - | - | - | - |
$5,328
-
lb
|
- | |
TOTAL RECOMMENDED | $83,584 | $25,643 |
$29,169
972,451
kWh
|
$17,992
-
kW-mo/yr
|
$(-6,436.0)
-
MMBtu
|
$30,120
-
gal
|
$5,328
-
lb
|
$7,411 | ||
TOTAL IMPLEMENTED | $19,562 | $3,668 |
$9,995
333,236
kWh
|
$4,239
-
kW-mo/yr
|
- | - |
$5,328
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs