ITAC Assessment: BD0466
ITAC logo
ITAC Assessment: BD0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Extruded Plastic Filaments
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 30,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,831 5,989,681
kWh
Electricity Demand $49,570 16,942
kW-mo/yr
Electricity Fees $1,781 -
Natural Gas $23,437 3,885
MMBtu
LPG $25,000 916
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $19,003 $15,800 $17,670
332,142
kWh
$1,333
-
kW-mo/yr
- - - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $11,592 $36,000 $(-11,650.0)
(-219,000)
kWh
$(-1,758.0)
-
kW-mo/yr
- $25,000
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,541 $8,170 $5,908
111,049
kWh
$446
-
kW-mo/yr
- - $87 $100
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,192 $15,910 $3,188
59,919
kWh
$900
-
kW-mo/yr
- - $47 $57
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,362 $20 $3,796
71,352
kWh
$566
-
kW-mo/yr
- - - -
06 2.7231: Use radiant heater for spot heating $2,803 $2,200 - - $2,803
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,559 $8,515 $2,625
49,339
kWh
$198
-
kW-mo/yr
- - $329 $(-593.0)
08 2.7447: Install vinyl strip / high speed / air curtain doors $921 $648 - - $921
-
MMBtu
- - -
09 2.7135: Install occupancy sensors $899 $1,275 $701
13,179
kWh
$198
-
kW-mo/yr
- - - -
10 2.4221: Install compressor air intakes in coolest locations $777 $1,000 $723
13,609
kWh
$54
-
kW-mo/yr
- - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 $25 $695
13,070
kWh
$6
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $54,350 $89,563 $23,656
444,659
kWh
$1,943
-
kW-mo/yr
$3,724
-
MMBtu
$25,000
-
MMBtu
$463 $(-436.0)
TOTAL IMPLEMENTED $30,624 $34,433 $27,599
518,779
kWh
$2,181
-
kW-mo/yr
$921
-
MMBtu
- $416 $(-493.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs