Assessment Year | 2024 |
---|---|
Principal Product | Plastic Siding |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 39 |
Plant Area |
155,829
ft2
|
Annual Production | 9,568
ton
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $362,627 | 5,288,504 |
kWh
|
$0.069 | |
Electricity Demand | $328,607 | 26,852 |
kW-mo/yr
|
$12.24 | |
Electricity Fees | $1,629 | - |
|
- | |
Natural Gas | $95,173 | 14,430 |
MMBtu
|
$6.60 | |
Other Gas | $12,864 | 1 |
MMBtu
|
$12,864.00 | |
Waste Disposal Costs | |||||
Water Usage | $909 | 8,452 |
Tgal
|
$0.11 | |
Water Disposal | $941 | 8,452 |
Tgal
|
$0.11 | |
Other Liquid (non-haz) | $17,229 | 1 |
gal
|
$17,229.00 | |
TOTAL YEARLY COSTS | $819,979 | ||||
RECOMMENDED SAVINGS* | $38,508 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $13,785 | $3,000 |
$11,016
159,666
kWh
|
$2,768
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,684 | $3,900 |
$8,184
118,615
kWh
|
- | - | - | $(-400.0) | $(-100.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,735 | $10,810 |
$2,134
30,926
kWh
|
$787
-
kW-mo/yr
|
- | - | $1,046 | $3,768 | |
04 | 2.8121: Apply for tax-free status for energy purchases | $3,054 | $2,080 | - | - |
$2,836
-
MMBtu
|
$218
-
gal
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,556 | $1,315 |
$2,556
37,043
kWh
|
- | - | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,203 | $120 |
$2,203
31,932
kWh
|
- | - | - | - | - | |
07 | 2.7135: Install occupancy sensors | $1,210 | $1,348 |
$1,210
17,543
kWh
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $281 | $422 |
$94
1,367
kWh
|
$23
-
kW-mo/yr
|
- | - | $164 | - | |
TOTAL RECOMMENDED | $38,508 | $22,995 |
$27,397
397,092
kWh
|
$3,578
-
kW-mo/yr
|
$2,836
-
MMBtu
|
$218
-
gal
|
$810 | $3,668 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs