ITAC Assessment: AT0050
ITAC logo
ITAC Assessment: AT0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CATHETER KITS
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,539 1,586,460
kWh
Natural Gas $13,127 2,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $859 $400 $859
17,585
kWh
-
02 2.2711: Utilize outside air instead of conditioned air for drying $6,892 $1,700 $6,892
140,973
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,822 $20,000 $29,551
604,924
kWh
$(-14,729.0)
-
MMBtu
04 2.2437: Recover waste heat from equipment $361 $300 - $361
-
MMBtu
05 2.7314: Reduce ventilation air $8,542 $203 $875
17,878
kWh
$7,667
-
MMBtu
TOTAL RECOMMENDED $31,476 $22,603 $38,177
781,360
kWh
$(-6,701.0)
-
MMBtu
TOTAL IMPLEMENTED $859 $400 $859
17,585
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs