| UW2518 #06 Y:2025 | 06 | 2025 | Replace fossil fuel equipment with electrical equipment | $16,903 | $102,300 | |
| UW2518 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,286 | $28,047 | |
| UW2518 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $795 | $1,729 | |
| UW2518 #03 Y:2025 | 03 | 2025 | Install vinyl strip / high speed / air curtain doors | $13,675 | $64,800 | |
| UW2518 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $59,635 | $40,500 | |
| UW2518 #01 Y:2025 | 01 | 2025 | Install back-up equipment | $150,000 | $1,963,087 | |
| UW2517 #03 Y:2025 | 03 | 2025 | Repair and eliminate steam leaks | $4,812 | $3,250 | |
| UW2517 #02 Y:2025 | 02 | 2025 | Insulate glazing, walls, ceilings, and roofs | $80,006 | $297,653 | |
| UW2517 #01 Y:2025 | 01 | 2025 | Install / repair insulation on steam lines | $1,400 | $1,080 | |
| UW2516 #03 Y:2025 | 03 | 2025 | Optimize production lot sizes and inventories | $150,000 | $1,200,000 | |
| UW2516 #02 Y:2025 | 02 | 2025 | Use most efficient type of electric motors | $47,926 | $139,500 | |
| UW2516 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $15,521 | $30,555 | |
| UW2515 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $20,506 | $16,909 | |
| UW2515 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $2,230 | $1,712 | |
| UW2515 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,985 | $5,850 | |
| UW2515 #01 Y:2025 | 01 | 2025 | Use most efficient type of electric motors | $8,499 | $27,909 | |
| OR0682 #03 Y:2016 | 03 | 2016 | Replace boiler | $1,937 | $9,815 | |
| OR0682 #02 Y:2016 | 02 | 2016 | Replace boiler | $4,289 | $23,625 | |
| OR0682 #01 Y:2016 | 01 | 2016 | Add equipment/ operators to reduce production bottleneck | $104,297 | $70,000 | |
| OR0681 #03 Y:2016 | 03 | 2016 | Turn off equipment when not in use | $1,360 | $532 |