Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0682 #03 Y:2016 Replace boiler $1,937 $9,815
OR0682 #02 Y:2016 Replace boiler $4,289 $23,625
OR0682 #01 Y:2016 Add equipment/ operators to reduce production bottleneck $104,297 $70,000
OR0681 #03 Y:2016 Turn off equipment when not in use $1,360 $532
OR0681 #02 Y:2016 Change procedures / equipment / operating conditions $12,375 $2,995
OR0681 #01 Y:2016 Use optimum temperature $7,040 -
BS0092 #06 Y:2016 Utilize controls to operate equipment only when needed $3,891 $3,900
BS0092 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,692 $3,161
BS0092 #04 Y:2016 Direct warmest air to combustion intake $4,190 $6,640
BS0092 #03 Y:2016 Reduce combustion air flow to optimum $1,842 $464
BS0092 #02 Y:2016 Insulate bare equipment $12,593 $2,530
BS0092 #01 Y:2016 Use existing dam to generate electricity $84,096 $646,400
OR0680 #05 Y:2016 Use waste heat from hot flue gases to preheat $4,714 $13,620
OR0680 #02 Y:2016 Replace electrically-operated equipment with fossil fuel equipment $42,852 $150,000
BS0045 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $3,790 $13,052
BS0045 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,833 $5,036
BS0045 #04 Y:2014 Reduce the pressure of compressed air to the minimum required $986 $1,373
BS0045 #03 Y:2014 Pay utility bills on time $7,864 $122
BS0045 #02 Y:2014 Use optimum thickness insulation $1,553 $2,600
BS0045 #01 Y:2014 Insulate bare equipment $6,415 $10,400