ITAC Assessment: OR0681
ITAC logo
ITAC Assessment: OR0681
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal fabrication
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 25
Plant Area 41,280
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,860
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,836 679,680
kWh
Electricity Demand $20,636 3,270
kW-mo/yr
Natural Gas $38,948 4,863
MMBtu
TOTAL YEARLY COSTS $158,420
RECOMMENDED SAVINGS* $20,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2211: Use optimum temperature $7,040 - - $7,040
-
MMBtu
-
02 3.1191: Change procedures / equipment / operating conditions $12,375 $2,995 - - $12,375
03 2.6218: Turn off equipment when not in use $1,360 $532 $1,360
9,351
kWh
- -
TOTAL RECOMMENDED $20,775 $3,527 $1,360
9,351
kWh
$7,040
-
MMBtu
$12,375
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs