ITAC Assessment: OK0647
ITAC logo
ITAC Assessment: OK0647
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Medium Density Fiberboard
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 166,840
ft2
Annual Production 400,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,454,752 33,636,325
kWh
Natural Gas $1,197,843 241,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $379,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $251,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $42,712 $2,250 $42,712
1,123,974
kWh
- -
02 2.2511: Insulate bare equipment $29,330 $9,344 - $29,330
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $21,369 $15,150 - $21,369
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,658 $3,635 $16,658
438,380
kWh
- -
05 2.2511: Insulate bare equipment $11,788 $9,041 - $11,788
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,412 $3,349 $2,412
63,484
kWh
- -
07 4.445: Install equipment to move product $166,400 $208,754 - - $166,400
08 2.7141: Lower light fixtures in high ceiling areas $87,000 $5,400 - - $87,000
09 2.6232: Install set-back timers $1,446 $372 - $1,446
-
MMBtu
-
10 2.7135: Install occupancy sensors $313 $395 $313
8,237
kWh
- -
TOTAL RECOMMENDED $379,428 $257,690 $62,095
1,634,075
kWh
$63,933
-
MMBtu
$253,400
TOTAL IMPLEMENTED $251,676 $229,761 $42,712
1,123,974
kWh
$42,564
-
MMBtu
$166,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs