ITAC Assessment: BS0092
ITAC logo
ITAC Assessment: BS0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 21
Plant Area 472,000
ft2
Annual Production 10,220,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,582 3,536,800
kWh
Electricity Demand $94,821 5,408
kW-mo/yr
Electricity Fees $1,554 -
Natural Gas $606,834 72,296
MMBtu
TOTAL YEARLY COSTS $1,034,791
RECOMMENDED SAVINGS* $111,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3322: Use existing dam to generate electricity $84,096 $646,400 $84,096
897,024
kWh
- -
02 2.2511: Insulate bare equipment $12,593 $2,530 - - $12,593
-
MMBtu
03 2.1113: Reduce combustion air flow to optimum $1,842 $464 - - $1,842
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $4,190 $6,640 - - $4,190
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,692 $3,161 $3,745
39,946
kWh
$947
-
kW-mo/yr
-
06 2.6231: Utilize controls to operate equipment only when needed $3,891 $3,900 $3,891
41,499
kWh
- -
TOTAL RECOMMENDED $111,304 $663,095 $91,732
978,469
kWh
$947
-
kW-mo/yr
$18,625
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs