ITAC Assessment: OR0680
ITAC logo
ITAC Assessment: OR0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Asphalt Products
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 80,000
ft2
Annual Production 11,000
ton
Production Hrs. Annual 1,837
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,134 429,400
kWh
Electricity Demand $30,823 1,602
kW-mo/yr
Electricity Fees $660 -
Natural Gas $46,102 4,925
MMBtu
TOTAL YEARLY COSTS $118,719
RECOMMENDED SAVINGS* $96,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,199

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $45,000 $66,392 - - - $45,000
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $42,852 $150,000 $31,791
331,848
kWh
$23,956
-
kW-mo/yr
$(-12,895.0)
-
MMBtu
-
03 2.1133: Adjust burners for efficient operation $2,467 $1,000 - - $2,467
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,732 $3,529 - $1,732
-
kW-mo/yr
- -
05 2.2414: Use waste heat from hot flue gases to preheat $4,714 $13,620 - - $4,714
-
MMBtu
-
TOTAL RECOMMENDED $96,765 $234,541 $31,791
331,848
kWh
$25,688
-
kW-mo/yr
$(-5,714.0)
-
MMBtu
$45,000
TOTAL IMPLEMENTED $49,199 $70,921 - $1,732
-
kW-mo/yr
$2,467
-
MMBtu
$45,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs