Assessment Year | 2016 |
---|---|
Principal Product | Asphalt Products |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 6 |
Plant Area |
80,000
ft2
|
Annual Production | 11,000
ton
|
Production Hrs. Annual | 1,837
hrs
|
Location (State) | Alaska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,134 | 429,400 |
kWh
|
$0.096 |
Electricity Demand | $30,823 | 1,602 |
kW-mo/yr
|
$19.24 |
Electricity Fees | $660 | - |
|
- |
Natural Gas | $46,102 | 4,925 |
MMBtu
|
$9.36 |
TOTAL YEARLY COSTS | $118,719 | |||
RECOMMENDED SAVINGS* | $96,765 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,199 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $45,000 | $66,392 | - | - | - | $45,000 | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $42,852 | $150,000 |
$31,791
331,848
kWh
|
$23,956
-
kW-mo/yr
|
$(-12,895.0)
-
MMBtu
|
- | |
03 | 2.1133: Adjust burners for efficient operation | $2,467 | $1,000 | - | - |
$2,467
-
MMBtu
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,732 | $3,529 | - |
$1,732
-
kW-mo/yr
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,714 | $13,620 | - | - |
$4,714
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $96,765 | $234,541 |
$31,791
331,848
kWh
|
$25,688
-
kW-mo/yr
|
$(-5,714.0)
-
MMBtu
|
$45,000 | ||
TOTAL IMPLEMENTED | $49,199 | $70,921 | - |
$1,732
-
kW-mo/yr
|
$2,467
-
MMBtu
|
$45,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs