ITAC Assessment: UD1113
ITAC logo
ITAC Assessment: UD1113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Molds and Dies for Tire
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range less than $500
k
# of Employees 106
Plant Area 50,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,087 4,092,000
kWh
Electricity Demand $59,427 7,332
kW-mo/yr
Electricity Fees $9,900 -
Natural Gas $14,240 1,071
MMBtu
Waste Disposal Costs
Water Usage $2,282 457
Tgal
Water Disposal $2,495 457
Tgal
TOTAL YEARLY COSTS $347,431
RECOMMENDED SAVINGS* $23,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7241: Install outside air damper / economizer on hvac unit $11,142 $3,621 $11,142
176,020
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,431 $1,312 $4,621
72,998
kWh
$810
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $3,832 $4,200 $3,832
60,537
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,836 $1,000 $2,413
38,121
kWh
$423
-
kW-mo/yr
TOTAL RECOMMENDED $23,241 $10,133 $22,008
347,676
kWh
$1,233
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs