ITAC Assessment: SF0416
ITAC logo
ITAC Assessment: SF0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 750,000
ft2
Annual Production 27,600
units
Production Hrs. Annual 3,140
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,833 357,782
kWh
Electricity Demand $15,894 2,002
kW-mo/yr
Natural Gas $6,256 707
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $2,478 - $599
4,641
kWh
- - $1,879
-
MMBtu
02 2.8112: Combine utility meters $2,336 $1,600 - - $2,336 -
03 2.4131: Size electric motors for peak operating efficiency $1,287 $2,705 $1,287
9,976
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,614 $18,273 $3,169
24,564
kWh
$749
-
kW-mo/yr
$696 -
TOTAL RECOMMENDED $10,715 $22,578 $5,055
39,181
kWh
$749
-
kW-mo/yr
$3,032 $1,879
-
MMBtu
TOTAL IMPLEMENTED $7,092 $18,273 $3,768
29,205
kWh
$749
-
kW-mo/yr
$696 $1,879
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs