ITAC Assessment: OR0682
ITAC logo
ITAC Assessment: OR0682
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Craft Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 40,000
ft2
Annual Production 1,250
units
Production Hrs. Annual 5,096
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,735 736,486
kWh
Electricity Demand $40,582 2,393
kW-mo/yr
Electricity Fees $2,489 -
Natural Gas $56,728 6,803
MMBtu
TOTAL YEARLY COSTS $181,534
RECOMMENDED SAVINGS* $110,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $104,297 $70,000 $(-9.0)
(-81)
kWh
- $11,858
-
gal
$24,000 $68,448
02 2.1224: Replace boiler $4,289 $23,625 - $4,289
-
MMBtu
- - -
03 2.1224: Replace boiler $1,937 $9,815 - $1,937
-
MMBtu
- - -
TOTAL RECOMMENDED $110,523 $103,440 $(-9.0)
(-81)
kWh
$6,226
-
MMBtu
$11,858
-
gal
$24,000 $68,448
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs