Assessment Year | 2016 |
---|---|
Principal Product | Craft Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
40,000
ft2
|
Annual Production | 1,250
units
|
Production Hrs. Annual | 5,096
hrs
|
Location (State) | Alaska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,735 | 736,486 |
kWh
|
$0.11 |
Electricity Demand | $40,582 | 2,393 |
kW-mo/yr
|
$16.96 |
Electricity Fees | $2,489 | - |
|
- |
Natural Gas | $56,728 | 6,803 |
MMBtu
|
$8.34 |
TOTAL YEARLY COSTS | $181,534 | |||
RECOMMENDED SAVINGS* | $110,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $104,297 | $70,000 |
$(-9.0)
(-81)
kWh
|
- |
$11,858
-
gal
|
$24,000 | $68,448 | |
02 | 2.1224: Replace boiler | $4,289 | $23,625 | - |
$4,289
-
MMBtu
|
- | - | - | |
03 | 2.1224: Replace boiler | $1,937 | $9,815 | - |
$1,937
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $110,523 | $103,440 |
$(-9.0)
(-81)
kWh
|
$6,226
-
MMBtu
|
$11,858
-
gal
|
$24,000 | $68,448 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs