Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0787 #05 Y:2017 Turn off equipment during breaks, reduce operating time $660 $100
MA0787 #04 Y:2017 Turn off equipment during breaks, reduce operating time $4,111 $100
MA0787 #03 Y:2017 Turn off equipment during breaks, reduce operating time $4,796 $100
MA0787 #02 Y:2017 Turn off equipment during breaks, reduce operating time $6,589 $100
MA0748 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $721 $2,245
MA0748 #06 Y:2015 Lower temperature during the winter season and vice-versa $1,168 $500
MA0748 #05 Y:2015 Turn off equipment when not in use $1,137 $100
MA0748 #04 Y:2015 Install occupancy sensors $1,687 $5,365
MA0746 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $1,874 $2,960
MA0746 #06 Y:2015 Repair or replace steam traps $2,323 $362
MA0746 #05 Y:2015 Eliminate or reduce compressed air usage $3,299 $3,000
MA0746 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $3,070 $2,100
MA0746 #03 Y:2015 Reduce ventilation air $13,483 $3,785
MA0746 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $14,017 $88,800
MA0746 #01 Y:2015 Install / repair insulation on steam lines $14,457 $7,354
MA0728 #03 Y:2014 Utilize a less expensive cooling method $2,940 $6,500
MA0728 #02 Y:2014 Replace boiler $10,114 $30,450
MA0728 #01 Y:2014 Install smaller boiler (increase high fire duty cycle) $16,512 $25,775
MA0726 #04 Y:2013 Interlock heating and air conditioning systems to prevent simultaneous operation $608 $500
MA0716 #09 Y:2013 Install occupancy sensors $322 $400