| Assessment Year | 2015 |
|---|---|
| Principal Product | Cutting tools, threading taps, reamers |
| NAICS | 333515: Cutting Tool and Machine Tool Accessory Manufacturing |
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 161 |
| Plant Area |
128,000
ft2
|
| Annual Production | 2,700,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Vermont |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $490,931 | 5,863,100 |
kWh
|
$0.084 |
| Electricity Demand | $133,201 | 15,744 |
kW-mo/yr
|
$8.46 |
| Electricity Fees | $6,443 | - |
|
- |
| LPG | $17,271 | 793 |
MMBtu
|
$21.78 |
| Fuel Oil #6 | $209,120 | 11,342 |
MMBtu
|
$18.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,523 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $14,457 | $7,354 | - |
$14,457
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,017 | $88,800 |
$14,017
167,468
kWh
|
- | |
| 03 | 2.7314: Reduce ventilation air | $13,483 | $3,785 |
$1,976
23,603
kWh
|
$11,507
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,070 | $2,100 |
$3,070
36,683
kWh
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $3,299 | $3,000 |
$3,299
39,420
kWh
|
- | |
| 06 | 2.2113: Repair or replace steam traps | $2,323 | $362 | - |
$2,323
-
MMBtu
|
|
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,874 | $2,960 |
$1,874
22,394
kWh
|
- | |
| TOTAL RECOMMENDED | $52,523 | $108,361 |
$24,236
289,568
kWh
|
$28,287
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $52,523 | $108,361 |
$24,236
289,568
kWh
|
$28,287
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs