ITAC Assessment: MA0726
ITAC logo
ITAC Assessment: MA0726
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Steering columns
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 248
Plant Area 165,000
ft2
Annual Production 810,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,915 6,696,549
kWh
Electricity Demand $241,330 52,066
kW-mo/yr
Electricity Fees $79,845 -
LPG $109,687 6,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7235: Install fossil fuel make-up air unit $25,418 $110,000 - $25,418
-
MMBtu
02 2.6218: Turn off equipment when not in use $3,232 $500 $3,232
47,257
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,119 $5,375 $3,119
45,606
kWh
-
04 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $608 $500 $289
4,224
kWh
$319
-
MMBtu
TOTAL RECOMMENDED $32,377 $116,375 $6,640
97,087
kWh
$25,737
-
MMBtu
TOTAL IMPLEMENTED $608 $500 $289
4,224
kWh
$319
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs