ITAC Assessment: WM0134
ITAC logo
ITAC Assessment: WM0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cookware
NAICS 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing
SIC 3365: Aluminum Foundries
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 550,000
ft2
Annual Production 650,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $530,399 8,242,437
kWh
Electricity Demand $425,209 31,453
kW-mo/yr
Electricity Fees $16,683 -
Natural Gas $254,035 51,745
MMBtu
Waste Disposal Costs
Water Usage $250,494 34,280
Tgal
TOTAL YEARLY COSTS $1,476,820
RECOMMENDED SAVINGS* $51,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $18,166 $70,712 $18,166
276,867
kWh
- -
02 2.4133: Use most efficient type of electric motors $13,318 $20,000 $9,826
154,967
kWh
$3,492
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $5,856 $1,728 $4,356
68,613
kWh
$1,500
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $5,059 $1,610 - - $5,059
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,990 $9,800 $3,683
58,009
kWh
$1,307
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $3,406 $690 $3,406
53,647
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $865 $164 - - $865
-
MMBtu
TOTAL RECOMMENDED $51,660 $104,704 $39,436
612,103
kWh
$6,300
-
kW-mo/yr
$5,924
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs