ITAC Assessment: IA0175
ITAC logo
ITAC Assessment: IA0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Lamp Processing
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 28,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 3,750
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,883 2,783,412
kWh
Electricity Demand $24,362 15,036
kW-mo/yr
Natural Gas $134,283 28,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,916 $5,640 - - $6,916
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,875 $4,543 $1,679
44,256
kWh
$196
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $647 $986 $647
16,999
kWh
- - - -
04 3.4151: Minimize water usage $471 $150 - - - - $471
-
Tgal
05 2.2136: Install / repair insulation on steam lines $252 $305 - - $252
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $239 $500 $208
5,569
kWh
$31
-
kW-mo/yr
- - -
07 3.4151: Minimize water usage $193 $400 - - - - $193
-
Tgal
08 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $192 $110
2,931
kWh
$13
-
kW-mo/yr
- - -
09 3.4157: Replace water cooling on processes with air cooling $161 $345 - - - - $161
-
Tgal
10 2.4314: Use synthetic lubricant $160 $315 $160
4,103
kWh
$39
-
kW-mo/yr
- $(-39.0) -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $153 $212 $120
3,224
kWh
$33
-
kW-mo/yr
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $456 $700 $378
9,965
kWh
$78
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $11,646 $14,288 $3,302
87,047
kWh
$390
-
kW-mo/yr
$7,168
-
MMBtu
$(-39.0) $825
-
Tgal
TOTAL IMPLEMENTED $10,936 $13,638 $3,094
81,478
kWh
$359
-
kW-mo/yr
$7,168
-
MMBtu
$(-39.0) $354
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs