ITAC Assessment: LS2218
ITAC logo
ITAC Assessment: LS2218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Agricultural Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 311
Plant Area 650,000
ft2
Annual Production 400
units
Production Hrs. Annual 2,470
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $711,429 7,113,063
kWh
Natural Gas $88,840 16,401
MMBtu
TOTAL YEARLY COSTS $800,269
RECOMMENDED SAVINGS* $183,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.5316: Contract a wood pallet recycling company $21,720 - - - $21,720 -
02 2.7261: Install timers and/or thermostats $3,196 $100 $3,196
31,954
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $535 $90 $535
5,350
kWh
- - -
04 3.1291: Eliminate practice of mixing waste streams $12,800 $2,600 - - $12,800 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,084 $800 $1,084
10,842
kWh
- - -
06 4.424: Improve space comfort conditioning $11,310 $17,640 $(-7,410.0)
(-74,100)
kWh
$18,720 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $15,287 $38,480 $15,287
152,873
kWh
- - -
08 2.7425: Clean or color roof to reduce solar load $78,203 $201,075 $8,003
80,028
kWh
$70,200 - -
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,482 $4,700 $1,482
14,820
kWh
- - -
10 3.2173: Convert to robotic painting $37,576 $140,000 - - - $37,576
TOTAL RECOMMENDED $183,193 $405,485 $22,177
221,767
kWh
$88,920 $34,520 $37,576
TOTAL IMPLEMENTED $40,738 $38,670 $19,018
190,177
kWh
- $21,720 -