Assessment Year | 2022 |
---|---|
Principal Product | Agricultural Equipment |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 311 |
Plant Area |
650,000
ft2
|
Annual Production | 400
units
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $711,429 | 7,113,063 |
kWh
|
$0.10 |
Natural Gas | $88,840 | 16,401 |
MMBtu
|
$5.42 |
TOTAL YEARLY COSTS | $800,269 | |||
RECOMMENDED SAVINGS* | $183,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,738 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5316: Contract a wood pallet recycling company | $21,720 | - | - | - | $21,720 | - | |
02 | 2.7261: Install timers and/or thermostats | $3,196 | $100 |
$3,196
31,954
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $535 | $90 |
$535
5,350
kWh
|
- | - | - | |
04 | 3.1291: Eliminate practice of mixing waste streams | $12,800 | $2,600 | - | - | $12,800 | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,084 | $800 |
$1,084
10,842
kWh
|
- | - | - | |
06 | 4.424: Improve space comfort conditioning | $11,310 | $17,640 |
$(-7,410.0)
(-74,100)
kWh
|
$18,720 | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,287 | $38,480 |
$15,287
152,873
kWh
|
- | - | - | |
08 | 2.7425: Clean or color roof to reduce solar load | $78,203 | $201,075 |
$8,003
80,028
kWh
|
$70,200 | - | - | |
09 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $1,482 | $4,700 |
$1,482
14,820
kWh
|
- | - | - | |
10 | 3.2173: Convert to robotic painting | $37,576 | $140,000 | - | - | - | $37,576 | |
TOTAL RECOMMENDED | $183,193 | $405,485 |
$22,177
221,767
kWh
|
$88,920 | $34,520 | $37,576 | ||
TOTAL IMPLEMENTED | $40,738 | $38,670 |
$19,018
190,177
kWh
|
- | $21,720 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs