ITAC Assessment: MA0728
ITAC logo
ITAC Assessment: MA0728
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Standard and Special cuttingTools
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 55,000
ft2
Annual Production 4,160
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,470 1,140,585
kWh
Electricity Demand $57,350 6,681
kW-mo/yr
Electricity Fees $23,366 -
LPG $26,391 1,507
MMBtu
Fuel Oil #4 $41,251 1,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #4 Savings Water Disposal Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $16,512 $25,775 - $(-6,708.0)
-
MMBtu
$23,220
-
MMBtu
-
02 2.1224: Replace boiler $10,114 $30,450 - $(-30,916.0)
-
MMBtu
$41,030
-
MMBtu
-
03 2.2628: Utilize a less expensive cooling method $2,940 $6,500 $(-1,636.0)
(-21,812)
kWh
- - $4,576
-
Tgal
04 2.2136: Install / repair insulation on steam lines $324 $350 - - $324
-
MMBtu
-
TOTAL RECOMMENDED $29,890 $63,075 $(-1,636.0)
(-21,812)
kWh
$(-37,624.0)
-
MMBtu
$64,574
-
MMBtu
$4,576
-
Tgal
TOTAL IMPLEMENTED $29,566 $62,725 $(-1,636.0)
(-21,812)
kWh
$(-37,624.0)
-
MMBtu
$64,250
-
MMBtu
$4,576
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs