5,420
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NT0051 #06 Y:2025 | 06 | 2025 | Lower temperature during the winter season and vice-versa | $586 | - | |
| NT0051 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,986 | $5,609 | |
| NT0051 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $12,814 | - | |
| NT0051 #01 Y:2025 | 01 | 2025 | Reduce scrap production | $98,944 | $80,000 | |
| NT0049 #04 Y:2025 | 04 | 2025 | Replace existing hvac unit with high efficiency model | $79,073 | $292,302 | |
| NT0049 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,840 | - | |
| NT0049 #02 Y:2025 | 02 | 2025 | Insulate bare equipment | $7,764 | $7,308 | |
| NT0049 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,061 | $5,609 | |
| NT0047 #08 Y:2025 | 08 | 2025 | Reduce space conditioning during non-working hours | $852 | - | |
| NT0047 #07 Y:2025 | 07 | 2025 | Analyze flue gas for proper air/fuel ratio | $4,083 | $1,434 | |
| NT0047 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $25,099 | $4,224 | |
| NT0047 #02 Y:2025 | 02 | 2025 | Chill water to the highest temperature possible | $89,410 | - | |
| NT0048 #07 Y:2025 | 07 | 2025 | Apply for tax-free status for energy purchases | $321,458 | $5,000 | |
| NT0048 #04 Y:2025 | 04 | 2025 | Close holes and openings in building such as broken windows | $13,913 | $73,500 | |
| NT0048 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,633 | $5,609 | |
| NT0046 #05 Y:2025 | 05 | 2025 | Install set-back timers | $1,557 | - | |
| NT0045 #06 Y:2025 | 06 | 2025 | Begin a practice of predictive / preventative maintenance | $150,000 | $9,690 | |
| NT0045 #05 Y:2025 | 05 | 2025 | Train operators for maximum operating efficiency | $150,000 | $100,000 | |
| NT0045 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $65,667 | $138,252 | |
| NT0045 #02 Y:2025 | 02 | 2025 | Upgrade controls on compressors | $13,920 | $30,800 |