| Assessment Year | 2024 |
|---|---|
| Principal Product | Purified Water, Alkaline Water, Flavored Beverage |
| NAICS | 312112: Bottled Water Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 221 |
| Plant Area |
441,000
ft2
|
| Annual Production | 233,326,643
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $3,859,364 | 74,461,538 |
kWh
|
$0.052 | |
| Electricity Demand | $1,304,472 | 123,706 |
kW-mo/yr
|
$10.54 | |
| Electricity Fees | $180,720 | - |
|
- | |
| Natural Gas | $280,896 | 96,322 |
MMBtu
|
$2.92 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,733,183 | 104,201 |
Tgal
|
$26.23 | |
| TOTAL YEARLY COSTS | $8,358,634 | ||||
| RECOMMENDED SAVINGS* | $200,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $33,597 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $60,028 | $83,001 | - | - | $60,028 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,406 | $4,553 |
$18,320
350,966
kWh
|
$5,086
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $27,850 | - |
$21,798
417,590
kWh
|
$6,052
-
kW-mo/yr
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $510 | - |
$510
9,773
kWh
|
- | - | - | |
| 05 | 4.812: Apply for investment incentives | $82,128 | $10,000 | - | - | $82,128 | - | |
| 06 | 2.7425: Clean or color roof to reduce solar load | $373 | $1,424 |
$114
2,190
kWh
|
$259
-
kW-mo/yr
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,747 | $1,279 | - | - | - |
$5,747
-
MMBtu
|
|
| TOTAL RECOMMENDED | $200,043 | $100,257 |
$40,743
780,518
kWh
|
$11,397
-
kW-mo/yr
|
$142,156 |
$5,747
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $33,597 | $1,279 |
$21,798
417,590
kWh
|
$6,052
-
kW-mo/yr
|
- |
$5,747
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs