ITAC Assessment: NT0038
ITAC logo
ITAC Assessment: NT0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Medical syringes
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 193,800
ft2
Annual Production 11,730,765
units
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,990 5,877,456
kWh
Electricity Demand $153,579 13,308
kW-mo/yr
Electricity Fees $75,071 -
Natural Gas $10,760 923
MMBtu
Waste Disposal Costs
Water Usage $39,520 4,097
Tgal
TOTAL YEARLY COSTS $778,920
RECOMMENDED SAVINGS* $76,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $370 $228
2,741
kWh
$162
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $7,913 - $4,619
55,653
kWh
$3,293
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,524 $5,609 $9,881
119,054
kWh
$2,642
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,311 - $1,933
23,289
kWh
$1,378
-
kW-mo/yr
-
05 4.812: Apply for investment incentives $52,835 $5,000 - - $52,835
TOTAL RECOMMENDED $76,972 $10,979 $16,661
200,736
kWh
$7,476
-
kW-mo/yr
$52,835
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs