| Assessment Year | 2025 |
|---|---|
| Principal Product | Medical syringes |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
193,800
ft2
|
| Annual Production | 11,730,765
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $499,990 | 5,877,456 |
kWh
|
$0.085 | |
| Electricity Demand | $153,579 | 13,308 |
kW-mo/yr
|
$11.54 | |
| Electricity Fees | $75,071 | - |
|
- | |
| Natural Gas | $10,760 | 923 |
MMBtu
|
$11.66 | |
| Waste Disposal Costs | |||||
| Water Usage | $39,520 | 4,097 |
Tgal
|
$9.65 | |
| TOTAL YEARLY COSTS | $778,920 | ||||
| RECOMMENDED SAVINGS* | $76,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $76,972 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $390 | $370 |
$228
2,741
kWh
|
$162
-
kW-mo/yr
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $7,913 | - |
$4,619
55,653
kWh
|
$3,293
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,524 | $5,609 |
$9,881
119,054
kWh
|
$2,642
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,311 | - |
$1,933
23,289
kWh
|
$1,378
-
kW-mo/yr
|
- | |
| 05 | 4.812: Apply for investment incentives | $52,835 | $5,000 | - | - | $52,835 | |
| TOTAL RECOMMENDED | $76,972 | $10,979 |
$16,661
200,736
kWh
|
$7,476
-
kW-mo/yr
|
$52,835 | ||
| TOTAL IMPLEMENTED | $76,972 | $10,979 |
$16,661
200,736
kWh
|
$7,476
-
kW-mo/yr
|
$52,835 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs