Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,338

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0600 #10 Y:2025 Replace existing hvac unit with high efficiency model $2,545 $9,511
LE0600 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $16,572 $26,690
LE0600 #06 Y:2025 Use properly designed and sized hvac equipment $14,877 $20,000
LE0600 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $13,149 $2,600
LE0600 #03 Y:2025 Install occupancy sensors $6,925 $420
LE0600 #02 Y:2025 Install timers and/or thermostats $92,399 $480
LE0600 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,082 -
LE0592 #09 Y:2024 Preheat combustion air with waste heat $513 $2,500
LE0592 #05 Y:2024 Install compressor air intakes in coolest locations $2,195 $4,000
LE0592 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $6,485 $7,000
LE0592 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $40,366 $3,000
LE0592 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $6,457 $100
DL0249 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $43,100 $30,000
LE0580 #07 Y:2024 Use solar heat to heat water $111,555 $686,000
LE0580 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,807 $11,787
LE0580 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,713 $2,350
LE0579 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $12,804 $49,222
LE0579 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,704 $2,300
LE0579 #01 Y:2024 Install occupancy sensors $1,555 $510
LE0571 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,911 $1,560