ITAC Assessment: LE0564
ITAC logo
ITAC Assessment: LE0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Carbon and Graphite Product
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 55,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,723 916,790
kWh
Electricity Demand $20,727 2,717
kW-mo/yr
Electricity Fees $22,150 -
Natural Gas $29,070 3,071
MMBtu
TOTAL YEARLY COSTS $153,670
RECOMMENDED SAVINGS* $40,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,016 - $393
4,420
kWh
$623
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,789 $100 $1,467
16,487
kWh
$322
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $5,156 $200 - - $5,156
-
MMBtu
04 2.7261: Install timers and/or thermostats $3,800 $400 $2,806
31,523
kWh
- $994
-
MMBtu
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $10,054 $5,500 $(-230.0)
(-2,560)
kWh
$(-107.0)
-
kW-mo/yr
$10,391
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $357 $1,080 $250
2,802
kWh
$107
-
kW-mo/yr
-
07 2.2443: Re-use or recycle hot or cold process exhaust air $1,314 $4,000 - - $1,314
-
MMBtu
08 2.7232: Replace existing hvac unit with high efficiency model $1,023 $4,500 $168
1,888
kWh
$855
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,861 $13,312 $2,319
26,060
kWh
$542
-
kW-mo/yr
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $697 $3,400 $582
6,548
kWh
$115
-
kW-mo/yr
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,320 $61,333 $10,285
115,559
kWh
$2,035
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,387 $93,825 $18,040
202,727
kWh
$4,492
-
kW-mo/yr
$17,855
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs