ITAC Assessment: NV0025
ITAC logo
ITAC Assessment: NV0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Seamless Rolled Rings
NAICS
n/a
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 120,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $602,263 7,780,188
kWh
Natural Gas $460,350 107,024
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8123: Pay utility bills on time $5,674 - $5,674
-
kWh
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $90,007 $29,278 - $90,007
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,176 $717 $2,176
28,136
kWh
-
04 2.4133: Use most efficient type of electric motors $33,664 $21,633 $33,664
434,936
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $644 $300 $644
8,499
kWh
-
06 2.3212: Optimize plant power factor $1,602 $5,472 $1,602
-
kWh
-
TOTAL RECOMMENDED $133,767 $57,400 $43,760
471,571
kWh
$90,007
-
MMBtu
TOTAL IMPLEMENTED $6,318 $300 $6,318
8,499
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs