ITAC Assessment: LE0570
ITAC logo
ITAC Assessment: LE0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Stonework
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 50,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,684 5,624,323
kWh
Electricity Demand $92,875 12,356
kW-mo/yr
Electricity Fees $208,097 -
Natural Gas $34,269 3,095
MMBtu
TOTAL YEARLY COSTS $734,925
RECOMMENDED SAVINGS* $174,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,292 - - $9,292
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,515 $15,000 $29,259
412,108
kWh
$4,256
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $55,246 $42,000 $48,230
679,313
kWh
$7,016
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $25,168 $26,500 $21,972
309,484
kWh
$3,196
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $4,252 $5,000 $3,396
47,840
kWh
$856
-
kW-mo/yr
-
06 4.651: Install back-up equipment $46,731 $90,000 - - $46,731
TOTAL RECOMMENDED $174,204 $178,500 $102,857
1,448,745
kWh
$24,616
-
kW-mo/yr
$46,731
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs