Assessment Year | 2024 |
---|---|
Principal Product | Stonework |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 141 |
Plant Area |
50,000
ft2
|
Annual Production | 100,000,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $399,684 | 5,624,323 |
kWh
|
$0.071 |
Electricity Demand | $92,875 | 12,356 |
kW-mo/yr
|
$7.52 |
Electricity Fees | $208,097 | - |
|
- |
Natural Gas | $34,269 | 3,095 |
MMBtu
|
$11.07 |
TOTAL YEARLY COSTS | $734,925 | |||
RECOMMENDED SAVINGS* | $174,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,292 | - | - |
$9,292
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,515 | $15,000 |
$29,259
412,108
kWh
|
$4,256
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $55,246 | $42,000 |
$48,230
679,313
kWh
|
$7,016
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $25,168 | $26,500 |
$21,972
309,484
kWh
|
$3,196
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,252 | $5,000 |
$3,396
47,840
kWh
|
$856
-
kW-mo/yr
|
- | |
06 | 4.651: Install back-up equipment | $46,731 | $90,000 | - | - | $46,731 | |
TOTAL RECOMMENDED | $174,204 | $178,500 |
$102,857
1,448,745
kWh
|
$24,616
-
kW-mo/yr
|
$46,731 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs