| Assessment Year | 2018 |
|---|---|
| Principal Product | Tile grout |
| NAICS | 325520: Adhesive Manufacturing |
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
190,000
ft2
|
| Annual Production | 250,000,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $198,363 | 3,734,563 |
kWh
|
$0.053 |
| Electricity Demand | $87,786 | 8,867 |
kW-mo/yr
|
$9.90 |
| Electricity Fees | $12,561 | - |
|
- |
| TOTAL YEARLY COSTS | $298,710 | |||
| RECOMMENDED SAVINGS* | $66,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,445 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $14,240 | $17,670 | - |
$14,240
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,300 | $51,700 |
$20,880
393,900
kWh
|
$6,420
-
kW-mo/yr
|
- | |
| 03 | 4.611: Begin a practice of predictive / preventative maintenance | $13,900 | $18,200 |
$2,710
51,150
kWh
|
$1,800
-
kW-mo/yr
|
$9,390 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,425 | $1,000 |
$1,855
35,000
kWh
|
$570
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,640 | - |
$4,110
77,520
kWh
|
$2,530
-
kW-mo/yr
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $1,020 | $345 |
$1,020
19,190
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $1,160 | $145 |
$880
16,600
kWh
|
$280
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $66,685 | $89,060 |
$31,455
593,360
kWh
|
$25,840
-
kW-mo/yr
|
$9,390 | ||
| TOTAL IMPLEMENTED | $52,445 | $71,390 |
$31,455
593,360
kWh
|
$11,600
-
kW-mo/yr
|
$9,390 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs