Assessment Year | 2024 |
---|---|
Principal Product | Tire recycling |
NAICS | 326212: Tire Retreading |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 142 |
Plant Area |
100,000
ft2
|
Annual Production | 5,821
ton
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $402,603 | 5,055,998 |
kWh
|
$0.080 |
Electricity Demand | $123,470 | 16,285 |
kW-mo/yr
|
$7.58 |
Electricity Fees | $23,308 | - |
|
- |
Natural Gas | $2,974 | 157 |
MMBtu
|
$18.94 |
TOTAL YEARLY COSTS | $552,355 | |||
RECOMMENDED SAVINGS* | $135,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $737 | - |
$563
7,039
kWh
|
$174
-
kW-mo/yr
|
|
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,674 | $140 |
$968
12,106
kWh
|
$706
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $719 | $70 |
$719
8,986
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,911 | $1,560 |
$3,001
37,518
kWh
|
$910
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,724 | $80,063 |
$21,266
265,824
kWh
|
$6,458
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $97,059 | $323,310 |
$71,136
889,200
kWh
|
$25,923
-
kW-mo/yr
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,515 | $9,473 |
$2,696
33,696
kWh
|
$819
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $135,339 | $414,616 |
$100,350
1,254,369
kWh
|
$34,989
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs