ITAC Assessment: UD0157
ITAC logo
ITAC Assessment: UD0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ELECTRODE ASSEMBLIES
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,977 1,723,036
kWh
Natural Gas $9,518 1,465
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,237 $250 $4,037
(-2,052)
kWh
- $(-800.0)
03 2.7111: Reduce illumination to minimum necessary levels $3,875 $1,994 $4,548
69,461
kWh
$(-673.0)
-
MMBtu
-
TOTAL RECOMMENDED $7,112 $2,244 $8,585
67,409
kWh
$(-673.0)
-
MMBtu
$(-800.0)
TOTAL IMPLEMENTED $7,112 $2,244 $8,585
67,409
kWh
$(-673.0)
-
MMBtu
$(-800.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs