ITAC Assessment: LE0579
ITAC logo
ITAC Assessment: LE0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Flavoring Extracts and Flavoring Syrups
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 155,474
ft2
Annual Production 12,035
ton
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,708 6,903,967
kWh
Electricity Demand $87,641 14,291
kW-mo/yr
Electricity Fees $122,226 -
Natural Gas $163,730 46,002
MMBtu
TOTAL YEARLY COSTS $821,305
RECOMMENDED SAVINGS* $115,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $1,555 $510 $1,555
23,924
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,704 $2,300 $1,443
22,209
kWh
$261
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $2,383 $5,000 $1,813
27,900
kWh
$570
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,804 $49,222 $10,589
162,913
kWh
$2,215
-
kW-mo/yr
- -
05 2.1224: Replace boiler $96,643 $400,000 - - $66,643
-
MMBtu
$30,000
TOTAL RECOMMENDED $115,089 $457,032 $15,400
236,946
kWh
$3,046
-
kW-mo/yr
$66,643
-
MMBtu
$30,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs