Assessment Year | 2024 |
---|---|
Principal Product | Kosher Milk |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $1 M to 5M |
# of Employees | 75 |
Plant Area |
70,000
ft2
|
Annual Production | 107,730
ton
|
Production Hrs. Annual | 7,644
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $491,741 | 5,238,724 |
kWh
|
$0.094 |
Electricity Demand | $93,459 | 15,247 |
kW-mo/yr
|
$6.13 |
Electricity Fees | $2,341 | - |
|
- |
Natural Gas | $99,826 | 29,535 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | $687,367 | |||
RECOMMENDED SAVINGS* | $264,878 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,713 | $2,350 |
$7,904
84,084
kWh
|
$809
-
kW-mo/yr
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $51,486 | $26,800 |
$46,705
496,860
kWh
|
$4,781
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,743 | $17,793 |
$9,033
96,096
kWh
|
$9,710
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,807 | $11,787 |
$8,047
85,607
kWh
|
$760
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $58,861 | $112,160 |
$56,826
604,531
kWh
|
$2,035
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,713 | $24,500 |
$6,094
64,152
kWh
|
$619
-
kW-mo/yr
|
- | |
07 | 2.9112: Use solar heat to heat water | $111,555 | $686,000 |
$58,600
623,404
kWh
|
- | $52,955 | |
TOTAL RECOMMENDED | $264,878 | $881,390 |
$193,209
2,054,734
kWh
|
$18,714
-
kW-mo/yr
|
$52,955 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs