ITAC Assessment: ND0189
ITAC logo
ITAC Assessment: ND0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product aluminum closures
NAICS
n/a
SIC 3466: Crowns and Closures
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area 460,000
ft2
Annual Production 3,000,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,064 19,146,835
kWh
Natural Gas $497,670 164,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $26,134 $33,690 $26,134
591,442
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,875 $6,890 $9,875
223,623
kWh
03 2.7135: Install occupancy sensors $3,327 $3,200 $3,327
75,322
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $385 $650 $385
8,792
kWh
05 2.7122: Disconnect ballasts $346 $955 $346
7,913
kWh
06 2.7111: Reduce illumination to minimum necessary levels $10,653 $500 $10,653
241,208
kWh
07 2.2614: Use cooling tower or economizer to replace chiller cooling $4,076 $18,000 $4,076
92,321
kWh
TOTAL RECOMMENDED $54,796 $63,885 $54,796
1,240,621
kWh
TOTAL IMPLEMENTED $36,355 $41,535 $36,355
822,978
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs