| Assessment Year | 2005 |
|---|---|
| Principal Product | corrugated fiberboard |
| NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
125,000
ft2
|
| Annual Production | 900,000,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $608,321 | 14,322,685 |
kWh
|
$0.042 |
| Electricity Demand | $82,373 | 10,187 |
kW-mo/yr
|
$8.09 |
| Natural Gas | $286,137 | 50,374 |
MMBtu
|
$5.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,892 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $10,212 | $3,850 | - | - |
$10,212
-
MMBtu
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,194 | $360 |
$4,631
38,355
kWh
|
$563
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $980 | $76 |
$980
23,060
kWh
|
- | - | - | - | |
| 04 | 2.2126: Lower operating pressure of condenser (steam) | $593 | - | - | - |
$593
-
MMBtu
|
- | - | |
| 05 | 2.2135: Repair and eliminate steam leaks | $550 | $1,050 | - | - |
$550
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,023 | $37,287 |
$9,921
278,678
kWh
|
$4,102
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $13,768 | $18,500 | - | - | - |
$13,768
-
lb
|
- | |
| 08 | 4.211: Consider use / purchase of bulk materials where possible | $37,125 | $52,500 | - | - | - | - | $37,125 | |
| TOTAL RECOMMENDED | $82,445 | $113,623 |
$15,532
340,093
kWh
|
$4,665
-
kW-mo/yr
|
$11,355
-
MMBtu
|
$13,768
-
lb
|
$37,125 | ||
| TOTAL IMPLEMENTED | $56,892 | $91,197 |
$14,552
317,033
kWh
|
$4,665
-
kW-mo/yr
|
$550
-
MMBtu
|
- | $37,125 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs