ITAC Assessment: SD0358
ITAC logo
ITAC Assessment: SD0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product corrugated fiberboard
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 125,000
ft2
Annual Production 900,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,321 14,322,685
kWh
Electricity Demand $82,373 10,187
kW-mo/yr
Natural Gas $286,137 50,374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.1221: Replace obsolete burners with more efficient ones $10,212 $3,850 - - $10,212
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,194 $360 $4,631
38,355
kWh
$563
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $980 $76 $980
23,060
kWh
- - - -
04 2.2126: Lower operating pressure of condenser (steam) $593 - - - $593
-
MMBtu
- -
05 2.2135: Repair and eliminate steam leaks $550 $1,050 - - $550
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,023 $37,287 $9,921
278,678
kWh
$4,102
-
kW-mo/yr
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,768 $18,500 - - - $13,768
-
lb
-
08 4.211: Consider use / purchase of bulk materials where possible $37,125 $52,500 - - - - $37,125
TOTAL RECOMMENDED $82,445 $113,623 $15,532
340,093
kWh
$4,665
-
kW-mo/yr
$11,355
-
MMBtu
$13,768
-
lb
$37,125
TOTAL IMPLEMENTED $56,892 $91,197 $14,552
317,033
kWh
$4,665
-
kW-mo/yr
$550
-
MMBtu
- $37,125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs