ITAC Assessment: UA0212
ITAC logo
ITAC Assessment: UA0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Rocket Engine Testing
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,376 1,189,832
kWh
TOTAL YEARLY COSTS $96,376
RECOMMENDED SAVINGS* $29,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,249 $36,249 $7,249
89,497
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $92 $129 $92
1,134
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,989 $30,818 $23,847
294,408
kWh
$(-4,858.0)
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,075 $9,350 $3,075
37,962
kWh
-
TOTAL RECOMMENDED $29,405 $76,546 $34,263
423,001
kWh
$(-4,858.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs