ITAC Assessment: MA0768
ITAC logo
ITAC Assessment: MA0768
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Rubber Coated Fabrics and Clothing
NAICS 313320: Fabric Coating Mills
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 14
Plant Area 88,000
ft2
Annual Production 4,500
thousand feet
Production Hrs. Annual 2,040
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,119 270,866
kWh
Electricity Demand $15,997 2,717
kW-mo/yr
Electricity Fees $462 -
Natural Gas $37,797 4,023
MMBtu
Waste Disposal Costs
Water Usage $1,430 21,090
Tgal
TOTAL YEARLY COSTS $100,805
RECOMMENDED SAVINGS* $7,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,870 $3,830 $3,870
23,171
kWh
- - -
02 2.2136: Install / repair insulation on steam lines $939 $3,914 - - $939
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $871 $1,000 $871
5,218
kWh
- - -
04 3.4151: Minimize water usage $587 $3,650 $(-41.0)
(-248)
kWh
- - $628
-
Tgal
05 2.3212: Optimize plant power factor $515 $3,480 - $515
-
kW-mo/yr
- -
06 2.2153: Close off unneeded steam lines $376 $4,348 - - $376
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $331 $2,648 $331
1,983
kWh
- - -
08 2.2136: Install / repair insulation on steam lines $313 $1,944 - - $313
-
MMBtu
-
09 2.2625: Chill water to the highest temperature possible $122 $300 $122
728
kWh
- - -
TOTAL RECOMMENDED $7,924 $25,114 $5,153
30,852
kWh
$515
-
kW-mo/yr
$1,628
-
MMBtu
$628
-
Tgal
TOTAL IMPLEMENTED $3,086 $14,856 $830
4,970
kWh
- $1,628
-
MMBtu
$628
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs