Assessment Year | 2011 |
---|---|
Principal Product | medical devices |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | less than $500 k |
# of Employees | 163 |
Plant Area |
120,399
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $476,233 | 5,594,945 |
kWh
|
$0.085 |
Electricity Demand | $62,395 | 11,368 |
kW-mo/yr
|
$5.49 |
Natural Gas | $22,347 | 4,657 |
MMBtu
|
$4.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,522 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $40,488 | $240 |
$40,070
445,219
kWh
|
- |
$418
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,806 | $28,000 |
$6,944
81,696
kWh
|
$862
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $676 | $1,500 |
$484
5,694
kWh
|
$192
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $356 | - |
$356
3,960
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,691 | $5,441 |
$1,301
15,304
kWh
|
$390
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $659 | $1,875 |
$659
7,319
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $458 | - |
$351
4,135
kWh
|
$107
-
kW-mo/yr
|
- | |
08 | 2.7261: Install timers and/or thermostats | $226 | $60 |
$226
2,662
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,360 | $37,116 |
$50,391
565,989
kWh
|
$1,551
-
kW-mo/yr
|
$418
-
MMBtu
|
||
TOTAL IMPLEMENTED | $43,522 | $7,616 |
$42,607
474,639
kWh
|
$497
-
kW-mo/yr
|
$418
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs