Assessment Year | 2003 |
---|---|
Principal Product | Meat Packaging |
NAICS | 311613: Rendering and Meat Byproduct Processing |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 190 |
Plant Area |
200,000
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $354,658 | 13,277,376 |
kWh
|
$0.027 |
Electricity Demand | $154,470 | 25,704 |
kW-mo/yr
|
$6.01 |
Natural Gas | $40,300 | 8,606 |
MMBtu
|
$4.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,745 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,624 | $90 |
$1,004
37,890
kWh
|
$620
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,056 | $155 |
$685
25,842
kWh
|
$371
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $435 | $15 |
$269
10,166
kWh
|
$166
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,189 | $6,998 |
$2,248
84,820
kWh
|
$941
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $930 | $408 |
$661
24,927
kWh
|
$269
-
kW-mo/yr
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,527 | $1,007 |
$1,165
43,977
kWh
|
$362
-
kW-mo/yr
|
- | - | |
07 | 2.5111: Convert from indirect to direct fired systems | $8,984 | $75,000 | - | - |
$8,984
-
MMBtu
|
- | |
08 | 4.447: Automate payroll system | $15,600 | $18,500 | - | - | - | $15,600 | |
TOTAL RECOMMENDED | $33,345 | $102,173 |
$6,032
227,622
kWh
|
$2,729
-
kW-mo/yr
|
$8,984
-
MMBtu
|
$15,600 | ||
TOTAL IMPLEMENTED | $17,745 | $83,673 |
$6,032
227,622
kWh
|
$2,729
-
kW-mo/yr
|
$8,984
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs